HISTORY
A mining history rooted in Bleicherode.
DEUSA’s development is closely linked to the history of mining in Bleicherode. Selected milestones show how extraction, processing and the company itself have evolved over time.
Company history
- 1858
- Start of the German potash mining industry
- 1899
- Construction of a Royal Prussian salt mine in Bleicherode
- 1903
- Start of commercial production. Potash production was based on the extraction of hard salt, a mixture of potassium chloride, sodium chloride and sulphates. Over time, operating processes were improved and the existing equipment was modernised, resulting in steadily increasing production.
- 1970–1978
- The foreseeable depletion of hard salt reserves required new extraction and processing technologies. The realisation that only carnallitite could be used in the long term led to the development of selective carnallitite solution mining and the corresponding processing technology.
- 1976
- First boreholes drilled as part of an exploration programme
- 1978
- Small-scale trials in the underground workings of the Bleicherode potash mine
- 1979
- Drilling of the first production borehole
- 1981
- Start of research and development activities at the Kehmstedt solution mining field
- 1985
- Start of hot leaching operations
- 1988
- Commissioning of the brine processing plant
- 1993
- Foundation of DEUSA Solbergwerke und Aufbereitungs GmbH
- 1995
- Construction of a natural-gas-fired gas engine power plant as a joint project with the former TEAG
- 1996
- Commissioning of a new plant for the production of bischofite (solid magnesium chloride, MgCl₂ · 6 H₂O)
- 2001
- Acquisition by DEUSA International GmbH. Launch of an extensive investment programme for occupational safety, stabilisation, capacity expansion and improved energy efficiency, with the aim of increasing production to 120 kt.
- 2009
- Development of new sections of the mining field and drilling of additional boreholes. Acquisition of E.ON’s shares in the power plant.
- 2012
- Commissioning of the KCl drying plant
- 2017
- Merger with NDH Entsorgungsbetreibergesellschaft mbH
- 2020
- Commissioning of the new potash drying plant